| 2006 | 
MIDI Consortium | 
MIDI Excavation | 
Removal of excavated material | 
Loading of barges, sail away and dumping | 
| 2007 | 
Gap Holdings | 
Fort Cambridge | 
Removal of excavated material | 
Loading of barges, sail away and dumping | 
| 2007 | 
Malta Freeport Terminal | 
North Quay Terminal 1 | 
Removal of outcrops | 
Loading of silt and rock, sail away and dumping | 
| 2007 | 
Malta Freeport Terminal | 
Oil Tanking | 
Removal of excavated material | 
Loading of barges, sail away and dumping | 
| 2008 | 
Bonnici Bros. | 
Smart City Malta | 
Removal of exavated material | 
Loading of barges, sail away and dumping | 
| 2008/9 | 
Malta Freeport Terminal | 
North Quay Terminal 2         | 
Dredging to depth of -17m | 
Loading of split and rock, sail away and dumping | 
| 2009 | 
Viset p.l.c | 
Gun Wharf | 
Removal of excavated material | 
Loading of barges, sail away and dumping | 
| 2009         | 
Malta Freeport Terminal                 | 
MFT | 
Dredging of fairway and quay approaches         | 
Loading of barges, sail away and dumping              | 
2015
 
  | 
Xatt ir-Risq | 
DWQ | 
Refurbishment and upgrading of the Deep Water Quay | 
Upgrading of the DWQ |